Highly Prospective region for REE
+1000km2 Tenure across the Lyons River Fault and Talga Fault in the Gascoyne Province.
Initial Field Work is completed
Positive results from initial surface sampling campaign
LARGE LANDHOLDING IN REE HOTSPOT
  • +1,000km2 tenure prospective for REE and base metals around the Lyons River Fault and Talga Fault in the Gascoyne Province
  • Multiple phases of REE mineralisation are associated with the Lyons River Fault
  • Highly prospective region for REE with two significant REE projects located adjacent to the Lyons River Fault:
    • Hastings Technology Metals’ (ASX: HAS) Yangibana Project (29.9Mt @ 0.93% Total Rare Earths Oxides (TREO))1
    • Dreadnought Resources (ASX: DRE) Yin Project (29.98Mt @ 1.04% TREO)2
  • Abra lead-silver Mine (60% Galena Mining and 40% Toho Zinc) is associated with splays off the Lyons River Fault.
FAVOURABLE GEOLOGY
  • Lyons River Fault and Talga Fault represent major crustal sutures in the central part of the Gascoyne Province
  • Provides a suitable plumbing system for the transportation of mineralised fluids
  • Hastings’ Yangibana and Dreadnoughts’ Yin REE deposits lie along cross cutting ferrocarbonatite structures adjacent to the Lyons River Fault
  • The Abra base metal deposit is associated with splays off the Lyons River Fault
NEXT STEPS
  • Review of historic data to prioritise targets for initial field assessment
  • A study of available imagery has highlighted areas with potential for ironstone outcrop
  • Broad GSWA geochemical sampling across the region has also indicated potential for REE enrichment
  • Field work expected to commence late Q3 of CY2023 including ground checks and prospecting where access is available
Project Gallery
  1. See ASX:HAS Announcement 6 February 2023 ↩︎
  2. See ASX:DRE Announcement 30 November 2023 ↩︎
Latest Announcements
picture of December Quarterly Report – Initial Fieldwork completed at Lyons

25 January, 2024

December Quarterly Report – Initial Fieldwork completed at Lyons

picture of Anomalous Results from Surface Sampling at Lyons REE Project

28 December, 2023

Anomalous Results from Surface Sampling at Lyons REE Project

picture of Initial Exploration Campaign Completed at Lyons REE Project

5 December, 2023

Initial Exploration Campaign Completed at Lyons REE Project